Swimming Hall
![]() |
The swimming hall area will measure up to 3.000 m2. The pool area consists of the main pool, therapy pool, children’s pool and the baby pool. The main pool will have a six-track pool course of 25 m.
The therapy pool is meant for special groups and e.g. hydrobic. The children and baby pools are meant for the younger swimmers. In addition, there will be a spring board and a 3-meter-high spring tower.
The swimming hall will be finished in the autumn of 2009.
The estimate of cost is reckoned to be 5,1 million euros. The state has admitted an aid of 750.000 euros for the project.
